Clayco backs DOE bid for nuclear-powered data center campus

Nuclear-Powered Data Centers: Why This $50B Shift Could Make You Rich (Or Leave You Behind)

Executive Brief

The Gist: Clayco is advising the DOE on building nuclear-powered data center campuses at Idaho National Laboratory—signaling a massive infrastructure shift toward energy-intensive tech construction.

  • The Trap: Most contractors think “data centers” means IT work—but this is heavy industrial construction (electrical, HVAC, concrete) requiring nuclear-grade certifications.
  • The Play: Start positioning now for the $50B data center boom by pursuing DOE contractor certifications and partnering with electrical engineering firms specializing in high-voltage systems.

Why This Matters

Here’s what the headlines won’t tell you: AI and cloud computing are burning through electricity faster than the grid can handle. Traditional data centers now consume 2-3% of total U.S. power. Nuclear is the only scalable solution that doesn’t require fossil fuels or massive solar farms.

Clayco—a $5.6B general contractor—doesn’t chase small projects. Their involvement means the DOE is serious about building multiple nuclear-powered campuses nationwide. This isn’t a pilot program; it’s the blueprint for the next decade of critical infrastructure.

For contractors, this creates a three-tier opportunity: (1) Direct work on data center construction (mechanical, electrical, concrete, steel), (2) Subcontracting for electrical grid upgrades connecting these facilities, and (3) Long-term maintenance contracts for cooling systems and backup power infrastructure.

The catch? Nuclear-adjacent projects require security clearances, specialized insurance, and compliance with NRC regulations. Small contractors who start the certification process now will have a 24-month head start when RFPs drop in 2026-2027. Those who wait will watch from the sidelines while certified firms lock in $2M+ contracts.

Bottom line: This is the modern equivalent of the Interstate Highway System—except it’s being built in 5 years, not 50. Position yourself correctly, or get left behind.


Contractor FAQ

Q: Should I pursue DOE contractor certification right now?
A: Yes, if your revenue exceeds $1M/year and you have electrical or mechanical capabilities—the certification process takes 18-24 months, and RFPs for these projects will likely begin in late 2026.

Q: What’s the realistic profit margin on nuclear-adjacent data center work?
A: Specialized infrastructure projects typically command 18-25% margins (vs. 8-12% for residential), but require bonding capacity of $5M+ and nuclear-grade liability insurance.

Q: Can HVAC contractors realistically compete for this work?
A: Absolutely—data centers require massive cooling infrastructure, precision airflow control, and 24/7 monitoring systems; start by partnering with mechanical engineers who hold DOE clearances.

Q: Is this just hype, or is nuclear data center construction actually happening?
A: It’s happening—Microsoft, Amazon, and Google have all announced nuclear power agreements for data centers in the past 12 months; federal backing through DOE accelerates this from “maybe” to “definitely.”


STOP Guessing on Job Costs

You are losing money on lost invoices and unbilled hours. See why we recommend Housecall Pro to stop the bleeding.

See the Comparison »

(Read our full Jobber vs. Housecall Pro Review)

Mike Warner
Author: Mike Warner

About the Founder Kore Komfort Solutions is an Army veteran-owned digital platform led by a 30-year veteran of the construction and remodeling trades. After three decades of swinging hammers and managing crews across the United States, I’ve shifted my focus from the job site to the back office. Our New Mission: To help residential contractors move from "chaos" to "profit." We provide honest, field-tested software reviews, operational playbooks, and insights into the AI revolution—empowering the next generation of trade business owners to build companies that last.

Leave a Comment